<kbd id="arliy"><center id="arliy"><progress id="arliy"></progress></center></kbd>
    • <ol id="arliy"><i id="arliy"><samp id="arliy"></samp></i></ol>
    • 97超级碰碰碰.免费视频,亚洲熟女av超清一区二区三区,99久久精品在免费线18,久久精品波多野结衣中文字幕,国产开嫩苞视频在线观看,亚洲女同精品一区二区三区,高潮在线欧美一区,四虎永久精品免费视频
      歡迎訪問沁陽(yáng)市晨光實(shí)業(yè)有限公司官方網(wǎng)站!

      沁陽(yáng)市晨光實(shí)業(yè)有限公司

      行業(yè)新聞

      秉持著堅(jiān)持品質(zhì)、責(zé)任、精心、執(zhí)著的理念,致力成為您滿意的合作伙伴,為客戶提供完善的產(chǎn)品和服務(wù)。

      位置:首頁(yè) > 行業(yè)新聞

      玻璃鋼防腐管道安裝要求
      時(shí)間:2022-07-05  瀏覽:5815次

        Requirements for installation of FRP pipes

        1、玻璃鋼防腐管道在安裝前應(yīng)對(duì)設(shè)備管口、預(yù)埋件、預(yù)留孔洞、鋼結(jié)構(gòu)等涉及管道安裝的內(nèi)容進(jìn)行復(fù)核。

        1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

        2、管道的坡度應(yīng)按圖紙的要求進(jìn)行調(diào)整,調(diào)整方法可以利用支座達(dá)到坡度要求,焊縫應(yīng)設(shè)置在便于檢修、觀察的地方。

        2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

        3、與傳動(dòng)設(shè)備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應(yīng)遠(yuǎn)離設(shè)備,以避免焊接產(chǎn)生應(yīng)力對(duì)傳動(dòng)設(shè)備安裝精度的影響。

        3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

        4、管道與機(jī)器連接前,應(yīng)防止強(qiáng)力相對(duì),在自由狀態(tài)下檢查法蘭的平行度和同軸度。

        4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

        5、安全閥應(yīng)垂直安裝,在投入試運(yùn)行時(shí),要及時(shí)調(diào)校安全閥。安全閥的調(diào)校在系統(tǒng)上進(jìn)行,開啟和回座壓力要符合設(shè)計(jì)文件的規(guī)定。

        5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

        6、閥門安裝前,按設(shè)計(jì)文件核對(duì)其型號(hào),并按介質(zhì)流向確定其安裝方向。當(dāng)閥門與管道以法蘭或螺紋方式連接時(shí),閥門應(yīng)在關(guān)閉狀態(tài)下安裝;如以焊接方式安裝時(shí),閥門不得關(guān)閉。

        6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

        7、儀表元件的臨時(shí)替代:所有儀表元件安裝時(shí),均采用臨時(shí)元件替代,等試壓、沖洗、吹掃工作結(jié)束后,投料前再正式安裝。

        7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


      主站蜘蛛池模板: 乱熟女高潮一区二区在线| 久久精品人妻av一区二区| 久久青草国产精品一区| 日本不卡一区二区三区在线 | 久久三级久久国产| 97资源人妻| 国产成人一区二区不卡| 日本人妻巨大乳挤奶水免费| AV色天堂| 页游| 日韩亚洲欧洲在线com91tv| 人妻?无码?中出| 成人一区二区不卡国产| 午夜射精日本三级| 波多野结衣高潮喷水| 夜夜春视频| 美腿制服丝袜国产亚洲| 精品不卡| 亚洲人成电影网站色mp4| 欧美xxxxhd高清| 男人日女人免费视频| 【_undefined?-?P站免费版?-?永久免费的福利视频平台】https://17630364268551281430832.nx37lbnqvd.com/column/all/show?t=&tags=%E5%90%8E%E5%85%A5%E9%AA%91%E9%A9%AC&page=2&orderBy=createTime&expanded=1 | 国模大胆一区二区三区| 久在线精品视频线观看视频| 天天澡天天揉揉AV无码人妻斩 | 中文字幕乱码中文乱码毛片| 欧美成 人 在线播放视频| 亚洲A∨无码| 九九视屏| 5g影院天天5g爽天天看| 国产成人8x视频网站入口| 亚洲a人片在线观看网址| 亚洲中文字幕久久无码精品| 深夜福利久久| 内射少妇一区27p| 伊人久久大香线蕉综合观| 国产日韩欧美在线观看不卡| 中文字幕日韩欧美一区二区三区| 日韩一二三区视频精品| 116美女极品a级毛片| 96精品|